Pole Barn Permits in Ohio | The Complete Guide

Pole barns are incredibly versatile structures that can be easily adapted to meet local building codes. This makes them a popular choice across Ohio for those looking to add a garage, build a home or business, or construct an agricultural or equestrian barn. However, many people feel hesitant about starting a pole barn project without first knowing whether they’re even permitted.
Finding clear information about permits and building requirements for pole barns can be challenging. That’s why we’ve made it simple by compiling a comprehensive list of pole barn permit requirements for every county in Ohio. We also cover whether pole barns are allowed in major cities across the state.
We believe pole barn construction should be straightforward. Keep reading to find out whether you need a permit, where to get it, and what’s required to apply and get approved.
Do You Need A Permit For A Pole Barn in Ohio?
In most cases, both building and zoning permits are required for pole barns in Ohio. This is because pole barns are considered new construction, which almost always necessitates a building permit. A zoning permit ensures that your property is appropriately zoned for the structure. If your project includes electrical or plumbing work, such as in the case of a barndominium, you’ll also need additional permits for those systems. You can typically determine which permits are required by contacting your local building department.
It’s important to note that different types of permits will be required for different pole barn projects. Let’s take a look at how different pole barn projects can affect which kind of permits are required.
Permits for Pole Barn Garages

Pole barn garages typically qualify as residential accessory structures, provided they are located on a residentially zoned property and are not intended for living space or built beyond a certain size. In Ohio, accessory structures under 200 square feet generally require only a zoning permit. This ensures that your property is appropriately zoned for such a structure. However, if the pole barn garage you plan to build exceeds 200 square feet, you will likely need both a zoning permit and a building permit.
Permits for Commercial Pole Barns

A commercial pole barn will require both a building permit and a zoning permit. The zoning permit allows building officials to verify that your property is appropriately zoned for commercial use. If you plan to include electrical, plumbing, or HVAC systems in the pole barn, separate permits for those installations will also be required.
Permits for Barndominiums

Barndominiums will likely require a building permit, a zoning permit, and additional permits for any electrical, plumbing, septic, or mechanical systems included in the project. It’s important to note that some jurisdictions may classify a barndominium as a dwelling, in which case the structure must meet all local requirements for dwelling units.
Permits for Equestrian or Agricultural Pole Barns

A building or zoning permit will likely be required for an equestrian or agricultural pole barn, especially if you plan to place it on a property that is not explicitly zoned or used for agricultural purposes. However, it’s important to note that the state of Ohio has special protections in place for agricultural buildings and structures.
If you are adding a building or structure to a property already being used for a certain agricultural activity, such as farming, then local zoning authorities cannot require a zoning certificate or prohibit the construction of a building for housing cattle or storing farm machinery. This means there may be some expectations depending on the use of your property.
You can learn more about this agricultural exemption in this article from Ohio State University. It’s important to always check with your building and zoning department to verify that your property is properly zoned for agricultural purposes and to ensure all the proper permits are obtained before you start building.
*Please note that CMT Components provides only the materials for pole barn kits and does not assemble or construct pole barns. It is the responsibility of the pole barn builder to file all necessary permits for the project.
Can You Build A Pole Barn Without A Permit?

In Ohio, accessory structures such as sheds don’t require a permit if they are 200 square feet. This means that a small pole barn used for storage purposes only may not require a building permit.
Which Counties in Ohio Require Permits for Building Pole Barns?

Below is a list of all the counties in Ohio, their permit requirements, and where you can find permits for pole barns. Please note that CMT Components provides pole barn kits to parts of Indiana, Kentucky, and Ohio. Visit our Areas We Serve page or contact us to find out if we can deliver materials for your next pole barn project to your location.
Adams County | County Engineer: (937)-544-2943 |
Allen County | The county seat’s Building Department, or your local city or town building authority, is responsible for permitting in Allen County. |
Ashland County | Permits are issued by township officials, such as the city of Ashland’s Building & Zoning Department. |
Ashtabula County | Ashtabula County Building Department |
Athens County | This is up to municipalities within the county. You can reach out to the Regional County Planner if you reside in an unincorporated area. |
Auglaize County | Auglaize County Permitting Info |
Belmont County | Permits, Agreements, & FormsMid-East Ohio Building Department: 740-526-0188 |
Brown County | Brown County Building Department |
Butler County | Butler County Building & Zoning Department |
Carroll County | Carroll County Building Maintenance |
Champaign County | Champaign County Building Regulations |
Clark County | Clark County Building Forms & Applications |
Clermont County | Clermont County Permits |
Clinton County | Clinton County Building & Zoning Department |
Columbiana County | Columbiana County Permit Applications |
Coshocton County | Coshocton County Engineer |
Crawford County | Crawford County Engineer Forms & Permits |
Cuyahoga County | Cuyahoga County Permits & Licenses |
Darke County | Residential Building Permits: 937-547-7379 Commercial Building, Electrical, Heating & Cooling Permits: 937-440-8121 |
Defiance County | Defiance County Engineer |
Delaware County | Delaware County Building Safety Department |
Erie County | Erie County Permits |
Fairfield County | Fairfield County Building Department |
Fayette County | Fayette County Building Department |
Franklin County | Franklin County Building Permits |
Fulton County | Fulton County Regional Planning Commission |
Gallia County | Gallia County Planning Commission Gallia County Permits |
Geauga County | Geagua County Permits |
Greene County | Greene County Building Regulation Department |
Guernsey County | Guernsey County Building Permits |
Hamilton County | Hamilton County Building & Inspections |
Hancock County | Hancock County Permits |
Hardin County | Hardin County Regional Planning Department |
Harrison County | Harrison County Commissioner’s Office |
Henry County | Henry County Planning Commission |
Highland County | Highland County |
Hocking County | Hocking County Building Permits |
Holmes County | Holmes County Planning Commission |
Huron County | Huron County does not issue building or zoning permits. Please contact your local city, village, or township officials for permitting information. |
Jackson County | Jackson County Planning Commission |
Jefferson County | Regional Planning Commission: (740)-283-8568 |
Knox County | Knox County Permits |
Lake County | Lake County Building Inspection Department |
Lawrence County | There are no countywide building or zoning regulations. Please contact your local officials for specific permitting requirements. |
Licking County | Licking County Building Department |
Logan County | Logan County Building Authority |
Lorain County | Lorain County Planning & Zoning |
Lucas County | Lucas County Building Regulations |
Madison County | Madison County Planning & Zoning Department |
Mahoning County | Mahoning County Building Inspections |
Marion County | There is no countywide building department. Please contact your local township or municipal officials for permitting requirements. |
Medina County | Medina County Building Department |
Meigs County | There is no countywide building authority. Please consult your local township or municipal officials for permitting requirements. |
Mercer County | Mercer County Permits |
Miami County | Miami County Building Regulations |
Monroe County | There is no countywide building authority. Please consult your local township or municipal officials for permitting requirements. |
Montgomery County | Montgomery County Building Regulations |
Morgan County | There is no countywide building authority. Please consult your local township or municipal officials for permitting requirements. |
Morrow County | Morrow County Zoning |
Muskingum County | Muskingum County Building Department |
Noble County | Noble County Auditor |
Ottawa County | Ottawa County Building Inspection |
Paulding County | Paulding County Building Permits |
Perry County | There is no countywide building authority. Please consult your local township or municipal officials for permitting requirements. |
Pickaway County | Pickaway County Building Department |
Pike County | Pike County Planning Commission |
Portage County | Portage County Permits & Applications |
Preble County | Preble County Building Regulations |
Putnam County | There is no countywide building authority. Please consult your local township or municipal officials for permitting requirements. |
Richland County | Richland County Building Department |
Ross County | Ross County Building Permits |
Sandusky County | Sandusky County Building Code Department |
Scioto County | There is no countywide building authority. Please consult your local township or municipal officials for permitting requirements. |
Seneca County | County Building Department: 419-447-8022 |
Shelby County | Shelby County Building Department |
Stark County | Stark County Building Inspection Office |
Summit County | Summit County Building Standards Department |
Trumbull County | Trumbull County Building Inspections |
Tuscarawas County | There is no countywide building authority. Please consult your local township or municipal officials for permitting requirements. |
Union County | Union County Building Department |
Van Wert County | There is no countywide building authority. Please consult your local township or municipal officials for permitting requirements. |
Vinton County | There is no countywide building authority. Please consult your local township or municipal officials for permitting requirements. |
Warren County | Warren County Building & Zoning Department |
Washington County | Washington County Building Department |
Wayne County | Wayne County Permits & Licenses |
Williams County | Williams County Auditor’s Office |
Wood County | Wood County Building Inspection Department |
Wyandot County | Wyandot County Building Department |
Do I Need A Permit for A Pole Barn in Adams County, Ohio?
While the Adams County website does not explicitly state the requirements for pole barns, a building permit is likely needed. Most new construction projects—including pole barns—typically require a building permit. You may also need a zoning permit to ensure the structure complies with local land-use regulations. Additionally, if your pole barn will include electrical or plumbing systems, separate permits for those installations may be required.
You can contact the Adams County engineer at (937)-544-2943 to find out exactly what permits are required for pole barns in your area.
Do I Need A Permit for A Pole Barn in Allen County, Ohio?
Most pole barns—whether used for commercial, agricultural, residential (such as barndominiums), or garage purposes—are considered new construction in Allen County, Ohio. As such, a permit is likely required, particularly in unincorporated areas. However, permitting requirements are determined by your city or town’s building authority, so it’s important to check with them first to understand what’s needed.
If you live in an unincorporated part of the county, the Lima Building Department can provide more information about permit requirements.
Do I Need A Permit for A Pole Barn in Ashland County, Ohio?
In Ashland County, building permits are issued by township officials rather than county authorities, so it’s important to check with your local building or zoning office before starting construction on a pole barn. For example, the City of Ashland requires an application for approval of any residential or non-residential building project—including pole barns—which can be found on their Permits and Plan Approvals page. A zoning permit is also required to confirm that your property is properly zoned for the proposed structure. Additionally, any site work, such as grading or leveling, will likely require a separate permit.
Do I Need A Permit for A Pole Barn in Ashtabula County, Ohio?
Ashtabula County requires building and zoning permits for pole barn projects, along with permits for any electrical, plumbing, mechanical, or HVAC systems. The exact permits you’ll need will vary depending on the type of pole barn, as outlined above. You can contact the Ashtabula County Building Department to find out exactly which permits are required for your specific project.
Do I Need A Permit for A Pole Barn in Athens County, Ohio?
Yes, you’ll likely need both a building and zoning permit, depending on the type of pole barn you plan to build, as outlined above. Permitting is handled by individual municipalities within the county, so you should check with your local building or zoning department to find out what they require. If you’re in an unincorporated part of the county, you can contact the Athens Regional County Planner for more information.
Do I Need A Permit for A Pole Barn in Auglaize County, Ohio?
Yes, a building and zoning permit is typically required for pole barn projects in Ohio. However, the exact types of permits needed may vary, as noted above. It’s important to remember that permitting is handled by individual municipalities within the county, so be sure to check with your local building or zoning department first to find out what is required. If you live in a rural area of the county, you can visit the Permit Info page on the Auglaize County website for more information.
Do I Need A Permit for A Pole Barn in Belmont County, Ohio?
While permits for pole barns will need to be obtained through your township, city, or village building or zoning officials first, you can find permits for unincorporated parts of Belmont County on their forms page. Typically, a building or zoning permit is required. For clarification on what permits you’ll need for your project, reach out to the Mid-East Ohio Building Department at 740-526-0188.
Do I Need A Permit for A Pole Barn in Brown County, Ohio?
Yes, a building and zoning permit are usually required to construct a pole barn, although the specific permits may vary depending on the type of project, as covered above. Municipal building and zoning departments enforce their own requirements, so be sure to check with your local officials first to determine exactly what permits are needed. If you’re in an unincorporated area, you can consult the Brown County Building Department for guidance.
Do I Need A Permit for A Pole Barn in Butler County, Ohio?
Yes, a building and zoning permit is required for pole barn projects in Butler County, Ohio. You can find the appropriate permits—whether for a commercial, residential, or agricultural pole barn—on the county’s Building & Zoning Applications page. Keep in mind that municipalities within the county may enforce their own permitting requirements, so be sure to check with your local building or zoning department to see if they have any additional regulations.
Do I Need A Permit for A Pole Barn in Carroll County, Ohio?
Yep, as is common throughout Ohio, you’ll likely need both a building and zoning permit for a pole barn in Carroll County. It’s worth noting that the county’s Building Maintenance Department only handles permitting for unincorporated areas. If you’re within city or town limits, you should check with your local building or zoning department to find out what permits are required for your pole barn project.
Do I Need A Permit for A Pole Barn in Champaign County, Ohio?
In Champaign County, Ohio, all detached garages over 200 square feet and new building construction projects require a building permit. A zoning permit will also likely be required to verify that your property is properly zoned for residential, commercial, or agricultural use, depending on the type of pole barn you plan to build. Permitting information for rural areas in the county is available through the Department of Building Regulations. If you live within a city or town’s jurisdiction, be sure to check with your local building or zoning office to find out what they require.
Do I Need A Permit for A Pole Barn in Clark County, Ohio?
Yes, you will likely need both a building and zoning permit. Building permits can be applied for through the Clark County Forms & Applications page, which also includes information specific to pole barn permitting. Zoning permits must be obtained from your local zoning department unless you reside in an unincorporated area, in which case they can be obtained through Clark County.
Do I Need A Permit for A Pole Barn in Clermont County, Ohio?
Yes, a building and zoning permit is required for most pole barn projects, except for agricultural pole barns, which are exempt from zoning permits as outlined above. Permits for Clermont County can be obtained through the county’s permit applications page.
Do I Need A Permit for A Pole Barn in Clinton County, Ohio?
Yes, you will likely need both a building and zoning permit to construct a pole barn in Clinton County, Ohio. Before you can obtain a building permit from the Clinton County Building & Zoning Department, you must first secure a zoning permit from your municipality. If you live in an unincorporated part of the county, the zoning permit can also be obtained through the county’s Building & Zoning Department.
Do I Need A Permit for A Pole Barn in Columbiana County, Ohio?
A building and zoning permit is required for most pole barn projects in Ohio. Municipalities within each county have primary authority over permitting regulations, so be sure to check with your local building and zoning department to understand their specific requirements. If you live in an unincorporated area or need to work with Columbiana County officials, you can visit the county’s Permit Applications page for more information.
Do I Need A Permit for A Pole Barn in Coshocton County, Ohio?
Permitting for pole barns is handled by municipal governments first, so you should start by contacting your local building or zoning department to find out what they require. Most areas in Ohio require both building and zoning permits to construct a pole barn. If you reside in a rural part of the county, permitting information can typically be obtained through the County Engineer’s office.
Do I Need A Permit for A Pole Barn in Crawford County, Ohio?
You’ll need a building and zoning permit to construct a pole barn in Crawford County, Ohio, along with any additional permits required for the type of project you’re planning. Start by checking with your local building or zoning department to find out what permits they require. If you do not reside within a municipality’s jurisdiction, you can find more information about permitting through the Crawford County Engineer’s office.
Do I Need A Permit for A Pole Barn in Cuyahoga County, Ohio?
Pole barns typically require both a building permit and a zoning permit. If you live within a municipality, these permits can be obtained from your local building or zoning department. If you reside outside of municipal jurisdiction, you can learn more about permitting requirements by contacting the County Permit Department at 216-443-8209.
Do I Need A Permit for A Pole Barn in Darke County, Ohio?
Yes, you will need a building permit and likely a zoning permit as well. It’s important to note that the Darke County Building Department only services unincorporated areas in the county as well as the city of Greenville, the villages of Ansonia, Arcanum, Castine, Gettysburg, Ithaca, New Madison, New Weston, Pitsburg, Union City, Versailles, Wayne Lakes, & Yorkshire. It’s critical to note that many cities, villages, and townships have their own authority over zoning, so be sure to reach out to your local officials to find out what their zoning permit requirements are.
If you reside in the county officials’ service area and would like to obtain a building permit, permits for residential projects can be obtained by calling 937-547-7379, and for commercial projects, by calling 937-440-8121.
Do I Need A Permit for A Pole Barn in Defiance County, Ohio?
A building and zoning permit is likely required for pole barn construction in Defiance County. However, it’s important to note that permitting is handled by individual municipalities, so you should contact your local building or zoning department to determine which permits are required. If you reside in an unincorporated area, the County Engineer can assist you with permitting requirements.
Do I Need A Permit for A Pole Barn in Delaware County, Ohio?
Yes, both building and zoning permits are required for pole barns built in Delaware County. If you reside within the jurisdiction of a city or town, you should consult with your local officials to obtain the necessary permits. If you live in an unincorporated part of the county, zoning permits must be obtained through the appropriate township authorities, while building permits are issued by Delaware County’s Building Safety Department.
Do I Need A Permit for A Pole Barn in Erie County, Ohio?
Most pole barn projects generally require approval through both zoning and building permits before construction can begin. Permits should be obtained from your local building or zoning officials first. If you live in an unincorporated area of Erie County, contact the County Engineer’s Office at 419-627-7710 for more information.
Do I Need A Permit for A Pole Barn in Fairfield County, Ohio?
Yes, you’ll need both a building and zoning permit to construct a pole barn in Fairfield County, Ohio. For unincorporated areas of the county, building permits are issued by the County Building Department, while zoning permits must be obtained through the appropriate township authority. If you reside within a city or town, contact your local building or zoning officials to find out what requirements apply to your property.
Do I Need A Permit for A Pole Barn in Fayette County, Ohio?
Yes, you will need a building, zoning, or any other permits as outlined above for a pole barn project in Fayette County, Ohio. Those in unincorporated parts of the county can obtain residential and commercial building permits through the county’s Building Department. Those within county or town limits should obtain the proper permits from their local building or zoning department.
Do I Need a Permit for a Pole Barn in Franklin County, Ohio?
Yes, new buildings—including homes and detached pole barns, as with most of the project types mentioned above—require building permits. Zoning permits are also required, but where you obtain them depends on your location within the county. You can visit the About the Building Department page on Franklin County’s website to determine whether your municipality handles zoning permits or if they are issued through the Franklin County Economic Development & Planning Department.
As noted on the Franklin County Building Department’s website, commercial building permits are issued by the State of Ohio. So, if you plan to construct a commercial pole barn, you will likely need to obtain permits from the Ohio Department of Commerce.
Do I Need a Permit for a Pole Barn in Fulton County, Ohio?
Yes, building and zoning permits are likely required from municipal authorities within the county. Be sure to contact your local building or zoning department to understand their specific requirements and obtain the necessary permits. If you are in Dover, Gorham, Pike, or Royalton Townships, you may need a development permit from the Fulton County Regional Planning Commission. Residents in other unincorporated areas should also contact the Commission to determine which permits are needed for their pole barn projects.
Do I Need a Permit for a Pole Barn in Gallia County, Ohio?
No zoning or building permits are required in the unincorporated areas of the county. However, if you live in a village or city within the county, you must contact your local officials and follow their specific permitting requirements. In unincorporated areas of Gallia County, you are required to notify the Auditor’s Office of any construction activity—including pole barns—by submitting a building notice within the first 60 days of construction.
Do I Need a Permit for a Pole Barn in Geauga County, Ohio?
Yes, a building permit, a zoning permit, and any other applicable permits are required to build a pole barn in Geauga County, Ohio. If you live in a city or village within the county, you should obtain these permits from your local building or zoning authority. However, residents in unincorporated areas can obtain building permits from Geauga County and zoning permits from their respective township authority.
Do I Need a Permit for a Pole Barn in Greene County, Ohio?
Yes, a permit is required for pole barns in Greene County, Ohio. The county issues specific building permits for pole barn accessory structures. However, permits may be required for other pole barn projects, such as barndominiums or commercial structures. In most cases, a zoning permit is also required to verify that your property is properly zoned for the intended use—except in certain cases involving agricultural pole barns, which may be exempt.
The Greene County Department of Building Regulations issues all commercial and residential building permits for most of the county, including many cities and villages. Exceptions include the cities of Fairborn and Xenia and the villages of Bowersville, Clifton, Cedarville, and Yellow Springs, as well as any federal or state-owned properties. Residents in those areas should contact their local building departments directly.
Do I Need a Permit for a Pole Barn in Guernsey County, Ohio?
Yes, pole barns fall under the category of “additional buildings,” according to the Guernsey County Auditor, meaning they require a building permit. Certain pole barns, such as barndominiums or commercial pole barns, may require different permits, so be sure to contact the County Auditor at 740-432-3601 to find out what permits are required.
Some municipalities issue their own permits. Below is a list of municipalities and the appropriate authority to contact for permitting information:
Cambridge Corporation | 740-432-3601 |
Byesville Incorporated Village | 740-685-5901 |
Jackson Township | 740-685-2568 |
Cambridge Municipal Airport | 740-432-3726 |
Senecaville Incorporated Village | 740-685-8279 |
Muskingham Watershed District | 330-343-6647 |
Do I Need a Permit for a Pole Barn in Hamilton County, Ohio?
Yes, you will need both a building and zoning permit to construct a pole barn in Hamilton County. Specific permitting requirements may vary depending on the type of pole barn you plan to build, as outlined above. Many municipalities within the county issue their own permits, so be sure to contact your local building or zoning department first to determine what is required. If you reside in an unincorporated area, permits can be obtained through the Hamilton County Building & Inspections Division.
Do I Need a Permit for a Pole Barn in Hancock County, Ohio?
Most pole barn projects require both a building permit and a zoning permit. In Hancock County, the issuance of these permits primarily falls under municipal authority. If you live within city or town limits, be sure to contact your local building or zoning department to determine which permits are required. For residents in unincorporated areas of the county, permitting information can be obtained by contacting the Hancock County Engineer’s Office at 419-422-7433.
Do I Need a Permit for a Pole Barn in Hardin County, Ohio?
Yes, you will likely need both a zoning and building permit for your pole barn in Hardin County, Ohio. Since there are no county-wide building codes, the exact requirements will vary depending on your location. It’s important to contact your local zoning or building department to determine which permits are required and to obtain them before starting your pole barn project.
Do I Need a Permit for a Pole Barn in Harrison County, Ohio?
Yes, but the exact requirements will vary depending on where you reside within the county. Typically, you’ll need both a building and zoning permit, which are issued by local, not county, officials. Therefore, it’s important to contact your local building or zoning department to ensure you obtain the proper permits. For those in unincorporated areas, zoning permits are handled by township officials, while building permits for projects over 600 square feet should be obtained from the Harrison County Commissioners’ Office.
Do I Need a Permit for a Pole Barn in Henry County, Ohio?
If you’re planning to build a pole barn in Henry County, you’ll most likely need to secure both a building permit and a zoning permit. Permit requirements are generally handled at the local level, so it’s important to check with your city, village, or township officials to find out what approvals are necessary for your specific location.
Do I Need a Permit for a Pole Barn in Highland County, Ohio?
In Highland County, most pole barn projects will require both building and zoning approval. Since permitting is handled by individual cities, towns, or townships, you’ll need to reach out to your local officials to confirm what’s required and make sure you have the correct permits in place before starting construction.
Do I Need a Permit for a Pole Barn in Hocking County, Ohio?
Yes, you will need both a building permit and a zoning permit to construct a pole barn in Hocking County, Ohio. Zoning permits should be obtained from your local zoning authority. Building permits for the City of Logan and for unincorporated areas are issued by the Hocking County Health Department.
If you are in an unincorporated area and plan to build a commercial pole barn, building permits must instead be obtained through the Ohio Department of Commerce at 800-523-3581. Please contact your local building department for guidance on permitting requirements for those outside of Logan or not in an unincorporated area.
Do I Need a Permit for a Pole Barn in Holmes County, Ohio?
Yes, you will need permits to build a pole barn in Holmes County. Most pole barn projects require both building and zoning permits, which are typically obtained through your local building or zoning department. If you reside in an unincorporated area, you can contact the Holmes County Planning Commission to learn more about permitting requirements for your location.
Do I Need a Permit for a Pole Barn in Huron County, Ohio?
Yes, most localities within Huron County require both building and zoning permits for pole barn construction. However, Huron County itself does not issue these permits. Be sure to contact your local city, village, township building, or zoning department to determine what is required and obtain the necessary approvals.
Do I Need a Permit for a Pole Barn in Jackson County, Ohio?
Yes, you will need both a building and zoning permit to construct a pole barn in Jackson County, Ohio. Permits are issued through city, village, or township officials, so if you reside within one of these jurisdictions, be sure to contact your local building or zoning department before beginning construction. In unincorporated areas, zoning permits are obtained from township authorities, while building permits are issued by the Jackson County Planning Commission.
Do I Need a Permit for a Pole Barn in Jefferson County, Ohio?
Pole barns built in Jefferson County will likely require both building and zoning permits. The issuance of these permits is primarily handled by municipal authorities, so be sure to contact your city, village, or township building and zoning officials to obtain the necessary approvals.
Do I Need a Permit for a Pole Barn in Knox County, Ohio?
In Knox County, pole barn permits are handled by local authorities. Therefore, it’s important to contact your city, village, or township building or zoning department to obtain the required permits. If you reside in an unincorporated area of the county and plan to add utilities to your pole barn, a utility permit may be required from the Knox County Engineer’s Office.
Do I Need a Permit for a Pole Barn in Lake County, Ohio?
Yes, you’ll need both a building and zoning permit to construct a pole barn in Lake County, Ohio. Zoning permits are handled by city, village, or township officials, so be sure to contact your local zoning authority to obtain the necessary approval. Building permits, on the other hand, are issued by the Lake County Building Inspection Department and must be secured before construction begins.
Do I Need a Permit for a Pole Barn in Lawrence County, Ohio?
Lawrence County does not issue permits for pole barn projects unless they are being built for commercial purposes. Therefore, it’s important to contact your local building and zoning departments to obtain the proper approvals. In most areas, both building and zoning permits are required to construct a pole barn.
Do I Need a Permit for a Pole Barn in Licking County, Ohio?
Yes, you will need a building permit to construct a pole barn in Licking County. Building permits are issued by the Licking County Building Department. Zoning permits, however, are handled by local authorities, so be sure to contact your city, village, or township zoning office to obtain the appropriate approvals.
Do I Need a Permit for a Pole Barn in Logan County, Ohio?
Yes, to build a pole barn in Logan County, you will need to obtain a zoning permit from your city, village, or township zoning authority and a building permit from the Logan County Building Authority.
Do I Need a Permit for a Pole Barn in Lorain County, Ohio?
Lorain County does not have a countywide building authority. As a result, building permits, required for constructing a pole barn, must be obtained from your local building department. Zoning permits are also required and can be obtained from your local zoning office. If you reside in one of the county’s 18 unincorporated townships, zoning permits are issued through the Lorain County Planning & Zoning Department.
Do I Need a Permit for a Pole Barn in Lucas County, Ohio?
Yes, you will need both a zoning and building permit to construct a pole barn in Lucas County, Ohio. Building permits are issued by the county’s Building Regulations Department unless you reside in the cities of Maumee, Oregon, or Toledo, or the villages of Berkey or Whitehouse—these jurisdictions issue their own building permits. Zoning permits must be obtained from your local municipal or township zoning authority.
Do I Need a Permit for a Pole Barn in Madison County, Ohio?
In Madison County, you will need both a zoning permit and a building permit to construct a pole barn. Zoning permits for unincorporated areas can be obtained from the Madison County Zoning Office, which oversees 13 of the county’s 14 townships. Building permits for these areas are issued through a partnership with the Village of West Jefferson. If you reside within a city, village, or township with its authority, please contact your local officials to obtain the necessary permits.
Do I Need a Permit for a Pole Barn in Mahoning County, Ohio?
Yes, you will need a building permit from the Mahoning County Department of Building Inspection to construct a pole barn. A zoning permit is also required, but it must be obtained from your local municipal or township zoning office rather than from county officials.
Do I Need a Permit for a Pole Barn in Marion County, Ohio?
Marion County does not have a countywide building department, so building and zoning permits for pole barn construction must be obtained from your local township or municipal authorities.
Do I Need a Permit for a Pole Barn in Medina County, Ohio?
Yes, you will need to obtain a building permit from the Medina County Building Department. Pole barn construction also requires a zoning permit, which must be obtained through your local township or municipal zoning office.
Do I Need a Permit for a Pole Barn in Meigs County, Ohio?
There is no countywide building authority in Meigs County. Please consult your local township or municipal officials for permitting requirements.
Do I Need a Permit for a Pole Barn in Mercer County, Ohio?
Yes, you will need both a building permit and a zoning permit, which can be obtained through your local building and zoning department. If you live in an unincorporated area or need help finding the right permitting authority, you can visit the Mercer County Permits page for more information specific to your locality.
Do I Need a Permit for a Pole Barn in Miami County, Ohio?
In Miami County, you will need a building permit from the Building Regulations Division and a zoning permit from the appropriate authority to construct a pole barn. Zoning permits for Concord, Monroe, Newberry, Newton, Springcreek, Staunton, Union, and Washington townships can be obtained through the Miami County Planning & Zoning Department. If you do not reside in one of these townships or if you live within a city or village, you must obtain your zoning permit from the corresponding local authority.
Do I Need a Permit for a Pole Barn in Monroe County, Ohio?
There is no countywide building or zoning authority, so building and zoning permits for most pole barn projects must be obtained from your local township or municipal officials. Be sure to contact them before beginning construction to ensure all requirements are met.
Do I Need a Permit for a Pole Barn in Montgomery County, Ohio?
Yes, you will need a building permit to construct a pole barn, along with a zoning permit to confirm that your property is properly zoned for the structure. Building permits are issued either by Montgomery County’s Building Regulations Division or your local building department, depending on your location. Zoning permits should be obtained from your local township or municipal zoning authority.
Do I Need a Permit for a Pole Barn in Morgan County, Ohio?
There is no countywide building authority in Morgan County. Please consult your local township or municipal officials for permitting requirements.
Do I Need a Permit for a Pole Barn in Morrow County, Ohio?
There are two permits typically required for pole barn construction:
- Building Permits
- Zoning Permits
Morrow County does not have a countywide building authority, so building permits must be obtained through your local building department. However, the county does have a zoning authority that issues zoning permits for the townships of Bennington, Canaan, Congress (excluding Candlewood Lake), Gilead, Harmony, North Bloomfield, and Washington. If you do not reside in one of these townships, please contact your local township or municipal zoning authority to obtain the appropriate permit.
Do I Need a Permit for a Pole Barn in Muskingum County, Ohio?
Pole barns in Muskingum County, Ohio, require both building and zoning permits. Commercial building permits are issued by the Mid-East Ohio Building Department, while residential permits within the City of Zanesville are handled by the city’s Building & Code Enforcement Department. Zoning permits are issued at the local level by the appropriate township, village, or city. For example, Falls, Perry, and Wayne Townships have their own zoning inspectors, and Zanesville zoning is managed by the city’s Planning & Zoning office. Always verify your property’s jurisdiction to obtain the correct permits before starting construction.
Do I Need a Permit for a Pole Barn in Noble County, Ohio?
Pole barns require both building and zoning permits before construction can begin. In Noble County, local township or municipal officials are primarily responsible for issuing these permits. If your pole barn project is valued at over $2,000 and you do not reside within a jurisdiction that handles its own permitting, you must also file a building permit with the County Auditor for property tax purposes. Be sure to check with your local officials to confirm zoning requirements and any additional permits that may apply.
Do I Need a Permit for a Pole Barn in Ottawa County, Ohio?
Yes, you will need both a building and zoning permit to construct a pole barn in Ottawa County, Ohio. Building permits are issued by the Ottawa County Department of Building Inspections, except in the villages of Clay Center and Oak Harbor, which handle their own building permits. All zoning permits must be obtained from your local township or municipal zoning authority.
Do I Need a Permit for a Pole Barn in Paulding County, Ohio?
Yes, you need both a building permit and a zoning permit to construct a pole barn in Paulding County, Ohio. The County Auditor’s Office issues building permits for Auglaize, Brown, and Jackson Townships, as well as the villages of Latty and Broughton, since these areas do not have zoning regulations. In all other townships and villages where zoning is in place, both building and zoning permits must be obtained through your local officials.
Do I Need a Permit for a Pole Barn in Perry County, Ohio?
Yes, you will need both a zoning permit and a building permit to construct a pole barn in Perry County. Since there is no countywide building or zoning authority, these permits must be obtained from your local township or municipal officials.
Do I Need a Permit for a Pole Barn in Pickaway County, Ohio?
In Pickaway County, you will likely need both a building permit and a zoning permit to construct a pole barn. Building permits are issued by the Pickaway County Building Department, while zoning permits must be obtained from your local township or municipal zoning authority.
Do I Need a Permit for a Pole Barn in Pike County, Ohio?
Yes, you need both a building permit and a zoning permit to construct a pole barn. These should be obtained from your local building or zoning department. However, if you reside in an unincorporated area of Pike County, building permits are issued by the Pike County Planning Commission.
Do I Need a Permit for a Pole Barn in Portage County, Ohio?
Yes, you will need both a building permit and a zoning permit to construct a pole barn in Portage County, Ohio. The Portage County Building Department issues building permits for all townships and villages in the county. However, if your property is located within the cities of Kent, Ravenna, Streetsboro, or Aurora, you must obtain your building permit directly from the city’s building department. Zoning permits are not handled at the county level and must be acquired from your local township or municipal zoning office, depending on where your property is located.
Do I Need a Permit for a Pole Barn in Preble County, Ohio?
In Preble County, both a building permit and a zoning permit are likely required to construct a pole barn. If your property is located in an unincorporated area, building permits can be obtained through the Preble County Building Department. For all other areas, including cities and villages, both building and zoning permits must be obtained from your local municipal or township officials.
Do I Need a Permit for a Pole Barn in Putnam County, Ohio?
There is no countywide building or zoning authority in Putnam County, so building and zoning permits for most pole barn projects must be obtained from your local township or municipal officials. Be sure to contact them before beginning construction to ensure all requirements are met.
Do I Need a Permit for a Pole Barn in Richland County, Ohio?
Yes, you will need a building permit to construct a pole barn. The Richland County Building Department issues building permits unless you reside in the City of Mansfield, where you must obtain your permit from the city’s building department. You will also need a zoning permit, which must be obtained from your local township or municipal zoning authority.
Do I Need a Permit for a Pole Barn in Ross County, Ohio?
In Ross County, Ohio, whether or not you need a building permit to construct a pole barn depends on your location and the intended use of the structure.
If you’re building a residential pole barn in an unincorporated area, a building permit is generally not required.
However, if your pole barn will be used for commercial purposes or as part of a multi-family development (four units or more), you must obtain a building permit from the Ross County Building Department.
If your property is located within a municipality, such as the City of Chillicothe or the City of Wellston, you’ll need to contact your local municipal building department to find out what their specific requirements are.
A zoning permit is typically required regardless of whether a building permit is needed. Zoning permits must be obtained from your local township or municipal zoning authority to ensure the structure complies with land-use regulations in your area.
Do I Need a Permit for a Pole Barn in Sandusky County, Ohio?
Yes, you will need both a building permit and a zoning permit to construct a pole barn in Sandusky County, Ohio. The Sandusky County Building Department issues commercial building permits for projects located in unincorporated areas as well as in certain municipalities like Fremont, Gibsonburg, and Bellevue. Building and zoning permits must be obtained through your local township or municipal authorities for residential pole barns or projects outside the county’s jurisdiction.
Do I Need a Permit for a Pole Barn in Scioto County, Ohio?
There is no countywide building or zoning authority in Scioto County, so building and zoning permits for most pole barn projects must be obtained from your local township or municipal officials. Be sure to contact them before beginning construction to ensure all requirements are met.
Do I Need a Permit for a Pole Barn in Seneca County, Ohio?
Yes, pole barns require both a building permit and a zoning permit. If you’re planning to construct a commercial pole barn, you can obtain a commercial building permit from the Seneca County Building Department by calling 419-447-8022. For all other cases, including residential projects and zoning permits, be sure to contact your local township or municipal building and zoning authority to obtain the appropriate permits.
Do I Need a Permit for a Pole Barn in Shelby County, Ohio?
In Shelby County, both building and zoning permits are required to construct a pole barn. These permits are typically obtained from your local building or zoning department. However, if you reside in an unincorporated area of the county, residential building permits are issued by the Shelby County Building Department. For commercial pole barn projects, building permits must be obtained from the Miami County Department of Development’s Building Regulations division.
Do I Need a Permit for a Pole Barn in Stark County, Ohio?
Yes, you need both a zoning permit and a building permit to construct a new structure, such as a pole barn, in Stark County, Ohio.
Zoning permits must be obtained from your local township, city, or village officials, as there are no countywide zoning regulations in place.
Building permits, on the other hand, are issued by the Stark County Building Inspection Office if your property is located in an unincorporated area or within the municipalities of Brewster, East Canton, Hills and Dales, Limaville, Magnolia, Meyers Lake, Minerva, or Waynesburg.
If your property is located in Alliance, Canton, Massillon, or North Canton, you will need to obtain building permits directly from your city’s building department.
Do I Need a Permit for a Pole Barn in Summit County, Ohio?
Yes, you will need both a building permit and a zoning permit to construct a pole barn in Summit County. Building permits can be obtained from the Summit County Building Standards Department unless your area has its own local building department. Zoning permits must be obtained from your local zoning authority. It’s important to check with your local government officials first to confirm which departments are responsible for issuing the required permits in your area.
Do I Need a Permit for a Pole Barn in Trumbull County, Ohio?
In Trumbull County, Ohio, you will need both a building permit and a zoning permit to construct a pole barn. If your property is located in an unincorporated area of the county, building permits are issued by the Trumbull County Building Inspection Department. However, if you reside within an incorporated municipality, such as a city or village, you must obtain your building permit through your local municipal building department. Zoning permits, regardless of location, are handled by local township or municipal zoning authorities. It’s important to contact your local officials to ensure you meet all applicable permitting requirements before beginning construction.
Do I Need a Permit for a Pole Barn in Tuscarawas County, Ohio?
There are no countywide requirements for pole barn permits in Tuscarawas County. Instead, permitting is handled by city, village, and township authorities. Please consult with your local officials to determine the required permits for your specific pole barn project.
Do I Need a Permit for a Pole Barn in Union County, Ohio?
All new building construction in Ohio typically requires both a zoning permit and a building permit. In Union County, Ohio, building permits for pole barns can be obtained from the County Building Department unless you live in Dublin, Plain City, or Unionville Center, where permitting is handled by separate authorities. Zoning permits must be obtained from your local city, village, or township zoning office.
Do I Need a Permit for a Pole Barn in Van Wert County, Ohio?
Permitting requirements are the responsibility of city, township, and village officials, not county officials. Therefore, if you want to find out whether you need a permit for a pole barn, you should contact your local building or zoning department.
Do I Need a Permit for a Pole Barn in Vinton County, Ohio?
In Vinton County, Ohio, permits for constructing a pole barn are handled entirely at the local level. The county does not issue building or zoning permits, so it’s important to check with your township, village, or city officials before starting construction. Most pole barn projects in Ohio require both a zoning permit to ensure proper land use and a building permit to meet construction standards. Because permitting rules vary by jurisdiction, you’ll need to contact your local authorities to determine exactly what’s needed for your specific location and project.
Do I Need a Permit for a Pole Barn in Warren County, Ohio?
Yes, you need a permit to build a pole barn in Warren County, Ohio. You will need both a zoning permit and a building permit before construction can begin. Building permits are issued by the Warren County Building Department if your property is located in an unincorporated area or within the Villages of Corwin, Maineville, Morrow, Pleasant Plain, South Lebanon, Waynesville, or the City of Lebanon. If you live in a different city, such as Mason, Springboro, or Franklin, you’ll need to contact your local municipal building department to obtain your permit.
Zoning permits must also be obtained from local authorities. If your property is in an unincorporated part of Franklin, Harlan, Turtlecreek, Union, or Washington Township, the Warren County Zoning Department handles zoning approvals. For all other areas, including incorporated cities and villages not listed above, zoning permits must be obtained through your local township or municipal zoning office.
Be sure to check with the appropriate departments before beginning construction to ensure you’re meeting all local requirements.
Do I Need a Permit for a Pole Barn in Washington County, Ohio?
In Washington County, Ohio, you will need both a building permit and a zoning permit to construct a pole barn. Building permits are issued by the Southeast Ohio Building Department (SEOBD), which serves both unincorporated areas and several municipalities within the county, including the cities of Belpre and Marietta, as well as the villages of Beverly, Lowell, Lower Salem, Macksburg, and New Matamoras. If your property is located within one of these jurisdictions, you can contact SEOBD to obtain the necessary building permit.
Zoning permits, however, are not handled at the county level and must be obtained from your local township or municipal zoning authority. It’s important to check with both departments before starting construction to ensure full compliance with local regulations.
Do I Need a Permit for a Pole Barn in Wayne County, Ohio?
In Wayne County, Ohio, you will need a building permit to construct a pole barn if your property is located in an unincorporated area. These permits are issued by the Wayne County Building Codes Department. If your property is within an incorporated municipality, such as a city or village, you must obtain your building permit from the local municipal building department.
Zoning permits are handled separately and are generally managed by local township or municipal zoning authorities. Chippewa Township, for example, has its own zoning regulations and requires permits accordingly. While most unincorporated areas in Wayne County do not enforce zoning, other regulations, such as health codes, building codes, or floodplain restrictions, may still apply.
Be sure to contact your local officials to confirm the specific permitting requirements for your pole barn project.
Do I Need a Permit for a Pole Barn in Williams County, Ohio?
Permit requirements for pole barns in Williams County vary depending on where you reside. It’s important to first check with your local building and zoning departments, as they can confirm whether a building or zoning permit is required for your project. If you live in an unincorporated area, you’ll need to file a building notice with the Williams County Auditor’s Office and obtain a zoning permit from your local township zoning authority.
Do I Need a Permit for a Pole Barn in Wood County, Ohio?
Yes, you will likely need both a building permit and a zoning permit to construct a pole barn in Wood County, Ohio. Building permits for residential pole barns in unincorporated areas are issued by the Wood County Building Inspection Department. This department also handles commercial building permits across the county.
However, if your property is located within a municipality that maintains its own building department, you will need to contact your local officials for permit requirements. In addition to a building permit, a zoning permit is required and must be obtained from your township or municipal zoning authority before construction can begin. Be sure to verify both building and zoning requirements with the appropriate local offices based on where your property is located.
Do I Need a Permit for a Pole Barn in Wyandot County, Ohio?
Yes, you will likely need both a building permit and a zoning permit to construct a pole barn in Wyandot County, but the process depends on where your property is located and the type of project you’re planning.
If you are constructing a commercial or industrial pole barn in the City of Upper Sandusky, or in the Villages of Harpster or Sycamore, or in an unincorporated area of the county, you will need to obtain a building permit from the Wyandot County Building Department. For all other areas, building permits must be obtained from separate authorities.
Zoning permits are not issued at the county level in Wyandot County. Instead, they are handled by local township or municipal zoning authorities. Regardless of your location, you should check with your local zoning office to confirm whether your property is zoned appropriately for a pole barn and to obtain any required zoning approval before beginning construction.
Which Cities in Ohio Allow Pole Barns?

Below is a list of some cities in Ohio and whether or not they allow pole barns to be built within city limits. It’s worth noting that CMT Components does serve all of these cities and would be happy to provide you with a pole barn kit to speed up the construction process even more!
Are Pole Barns Allowed in the Village of Alexandria, Ohio?
Yes, so long as the appropriate permits are obtained from the Zoning & Code Enforcement Department. You’ll likely need both a building permit and a zoning permit.
Are Pole Barns Allowed in the City of Blue Ash, Ohio?
Yes! Pole barns are generally treated as accessory structures unless you plan to build a barndominium or a commercial pole barn. In those cases, you must follow the building regulations for dwelling units or commercial buildings. Building and zoning permits for pole barns can be obtained through the Blue Ash Community Development Department.
Are Pole Barns Allowed in the City of Cincinnati, Ohio?
Yes, pole barns are permitted in Cincinnati as long as they comply with city building codes. It’s important to note that the specific requirements your structure must meet will depend on the type of pole barn you plan to build, as outlined above. You can find out what regulations apply to your project and obtain the necessary building and zoning permits from the Cincinnati Building Department.
Are Pole Barns Allowed in the City of Columbus, Ohio?
Yes, as long as you comply with the city’s building code and obtain the appropriate building and zoning permits. You can apply for these permits or get your questions answered by contacting Building & Zoning Services.
Are Pole Barns Allowed in the Village of Covington, Ohio?
Yes, so long as they comply with the village’s zoning regulations and building codes. Building and zoning permits for pole barns in Covington can be obtained through the Department of Community Development & Planning.
Are Pole Barns Allowed in the City of Dayton, Ohio?
Yes, pole barns are permitted in Dayton, Ohio, provided they comply with the standards of the 2013 Residential Code of Ohio and all required building and zoning permits are obtained. Additionally, inspections must be performed as part of the approval process. To apply for permits and schedule inspections, contact the City of Dayton’s Planning & Development Department.
Are Pole Barns Allowed in the City of Fairfield, Ohio?
Yes, pole barns are permitted in Fairfield, Ohio, as long as they comply with city building codes and the proper building and zoning permits are obtained. These permits can be acquired through Fairfield’s Building & Zoning Division.
Are Pole Barns Allowed in the City of Lebanon, Ohio?
Yes, pole barns are permitted in Lebanon, Ohio, as long as the structure complies with the city’s building codes and all required permits are obtained. Pole barns require both a zoning permit and a building permit. Zoning permits can be obtained from the City’s Department of Planning and Zoning, while building permits are issued by the Warren County Building Department.
Are Pole Barns Allowed in the City of Loveland, Ohio?
Yes, pole barns are allowed in Loveland, Ohio, as long as they meet building code requirements and the proper permits are obtained. In Loveland, both a building permit and a zoning permit are required to construct a pole barn. These can be obtained through the city’s Building & Zoning Department.
Are Pole Barns Allowed in the City of Mason, Ohio?
Pole barns are permitted in Mason, Ohio, provided they comply with all applicable building codes and local regulations. Before starting construction, you’ll need to secure both a building permit and a zoning permit. These permits are handled by the City of Mason’s Engineering & Building Department, which oversees code compliance, plan reviews, and inspections for new structures. Be sure to contact the department to ensure your project meets all requirements.
Are Pole Barns Allowed in the City of Montgomery, Ohio?
In the City of Montgomery, Ohio, constructing a pole barn is permissible, provided it complies with local building codes and zoning regulations. To proceed with such a project, you’ll need to secure both building and zoning permits. Permits can be obtained from the Department of Community Development.
Are Pole Barns Allowed in the City of Norwood, Ohio?
Yes, pole barns are allowed in Norwood, Ohio, provided they comply with local building codes and the necessary permits are obtained. In most cases, both a building permit and a zoning permit are required. These can be obtained through the Norwood Building Department.
Are Pole Barns Allowed in the City of Reading, Ohio?
Yes, as long as the structure is built in compliance with the city’s building codes and the proper building and zoning permits are obtained before construction. Permitting information and building code details can be obtained through the Department of Building & Zoning.
Are Pole Barns Allowed in the Village of Sardinia, Ohio?
Yes, pole barns are allowed in the Village of Sardinia as long as they comply with local building codes and the appropriate zoning permits are obtained. Permit information and applications can be found on the Village of Sardinia’s Zoning and Permits page.
Are Pole Barns Allowed in the City of Wilmington, Ohio?
Yes, pole barns are allowed in Wilmington, Ohio, provided they comply with the 2024 Ohio Building Code and the appropriate permits are obtained prior to construction. You will likely need both a building permit and a zoning permit, which can be obtained through the Wilmington Department of Building & Zoning.
Can You Live in A Pole Barn in Ohio?

Yes, you can live in a pole barn in Ohio, provided it complies with local building codes and zoning regulations. You’ll need to ensure the structure meets all residential building code requirements for a dwelling unit. Additionally, be sure to obtain all necessary permits, including those for plumbing, electrical, and HVAC installations.
Barndominiums—a blend of pole barns and traditional homes—offer an ideal living space for those interested in this lifestyle. Read our guide on barndominiums or visit our Barndominium page to learn more about these versatile structures!
How Much Do Building Permits Cost in Ohio?

The cost of building permits in Ohio varies depending on the project’s scope, with some fees calculated per square foot. Fees also differ between municipalities, so costs can range from as little as $50 to over $1,000, depending on what you plan to build. It’s essential to check with your local permitting office to understand their specific fee structure and get a more accurate estimate for your pole barn project.
Pole Barn Permit Requirements

Pole barns being built in Ohio typically require several permits, including:
Building Permit
To obtain a building permit, you’ll need to visit the proper building authority for your area and get a permit application. This application should be filled out and include:
- Detailed building plans
- Property site layout
- Estimated cost
- Contractor/builder information
Your building official will review the permit and approve your project, provided that it meets local building requirements.
Zoning Permit
The process of obtaining a zoning permit is similar to that of a building permit. You will need a permit application that you fill out and submit with the following information:
- Minimum lot size
- Distance from property lines (setbacks)
- Your zoning district
Officials will review and ensure that your plans comply with zoning regulations and that your pole barn is being built on a property that is properly zoned for that type of structure.
Electrical, Plumbing, or HVAC Permits
These are required depending on what you plan to add to your pole barn:
- Electrical Permit: If you plan to add lights, outlets, or breaker panels
- Plumbing Permit: If you plan to add water supply or drainage systems
- Mechanical/HVAC Permit: If you plan to add any heating or cooling systems
Looking to Simplify the Pole Barn Building Process?

CMT Components was founded with the goal of delivering excellent service and making it easy for contractors, wholesalers, and homeowners to get the high-quality materials they need for their next construction project. In support of that mission, we’ve created this comprehensive guide to pole barn permit requirements so you can quickly find out whether a permit is needed, all in one place.
We also offer complete pole barn kits designed to simplify the construction process. With metal siding and roofing panels, as well as roof trusses, our kits include everything you need to get started. All panels and trusses are custom-cut to your project’s exact sizing, saving you time on sourcing and cutting materials.
It’s important to note that while we provide pole barn kits, we do not assemble them and, therefore, cannot file any permits for you. This must be performed by whoever is building the pole barn. Have questions? Contact us—we’re happy to help!
Ready to get started? Start designing your dream pole barn in 3D today!